When it comes to roof replacement or a brand-new roof installation, homeowners and business owners alike often ask the same question: “How long is this going to take?” While it’s a fair and straightforward question, the answer depends on a variety of factors, including the size of your property, the roofing material used, weather conditions, and the contractor’s experience.
It typically takes 1 to 3 days, on average, to complete most residential roof installations, although commercial projects will take anywhere from a week to more than that. Throughout this guide, we'll take you through every step of the standard roofing project so you're aware of what to expect—and what may hold up the process.
Step 1: The Initial Consultation and Estimate (1–3 Days)
Prior to any work being done, you will have to arrange for a consultation with a roofing firm. At this phase, the contractor will:
If you are in Washington State, a lot of Seattle roofing firms have same-day inspection followed by a written proposal within 24–48 hours. This phase is important for defining scope, schedule, and cost.
Step 2: Permits and Material Ordering (1–7 Days)
After the estimate is accepted and a contract signed, the contractor starts obtaining permits—if necessary in your jurisdiction. Most cities have easy online processes, but the response time can be anywhere from a day to a week based on local ordinance.
At the same time, your roofing materials (shingles, underlayment, flashing, etc.) are ordered. Specialty or custom products may extend delivery times by a few days. If you’re working with commercial roof contractors, they’ll also coordinate with suppliers for any large-scale or reinforced materials used in industrial-grade roofs.
Step 3: Site Preparation and Safety Set-Up (1 Day)
Prior to the actual installation process, the roofing team will prepare the site. This usually involves:
This is usually done in a matter of hours but is important for ensuring safety and cleanliness during the project.
Step 4: Roof Removal (1 Day)
In all but a few instances, the existing roof needs to be removed down to the deck prior to the installation of the new material. This entails:
For a typical-sized house, this can be done in a day. But if there's a lot of damage or if the house is especially large, plan on this stage extending into day two.
Step 5: Deck Preparing and Repairs (0.5–1 Day)
Once the old roof is removed, your contractor will examine and fix any areas of the wooden deck that are water-damaged, moldy, or structurally impaired. Even small problems need to be resolved before installation starts, so the new roof will rest safely.
This step is commonly fast but a must for aged homes or property that has received several patch attempts over time.
Step 6: Flashing and Installing Underlayment (0.5 Day)
The water-resistant flashing and underlayment is next. The materials provide a moisture barrier between your house and the world around it. Insuring that installation is correct prevents long-term concerns such as rot, leaks, and mold from forming.
Quality flashing and underlayment can be put in place in a matter of hours, laying the groundwork for your final layer of protection—your roofing membrane or shingles.
Step 7: Roof Installation – The Main Event (1–2 Days)
The last step is putting in your chosen roofing material. Asphalt shingles are the most popular for homes and usually get put on in 1–2 days, depending on weather and crew size.
Tile, slate, or metal roofing will take longer due to the level of precision needed for layout and fastening. Commercial roofing services in commercial buildings utilize flat roofing systems such as TPO, EPDM, or modified bitumen, which need more layers and equipment.
Factors that may prolong this phase are:
Step 8: Clean-Up and Final Inspection (0.5 Day)
After your new roof has been installed, the crew will:
A final walk-through by a project manager or inspector can be done to verify all specifications were achieved and the work site is clean and safe upon completion. Homeowners will have concluded installation at this point. For companies, commercial roofing contractors also offer documentation of building compliance and warranty.
Variables That Can Cause the Timeline to Be Longer
Even with the best planning and professionalism, certain variables can extend your roof installation:
Residential vs. Commercial Projects
Although the above steps are generally applicable, commercial roofing work is usually longer because of scale and complexity. Flat roofs, for instance, have layers of insulation, vapor barriers, and membrane systems that are more labor-intensive than pitched residential roofs.
Additionally, commercial work often entails regulatory coordination, particularly for public buildings or retail outlets where business continuity has to be ensured.
Final Thoughts
So, how long does a roof installation really take? For most residential homes, you’re looking at 2 to 5 days from start to finish, provided there are no major delays. For commercial properties, the timeframe can be anywhere from one to two weeks, especially if dealing with unique materials or structures.
Hiring professionals with local expertise—such as established Seattle roofing companies—can help streamline the process. They understand both the building codes and the unpredictable Pacific Northwest weather and can provide reliable scheduling and high-quality results.
If you’re planning your next roofing project, the key is preparation, communication, and choosing the right contractor for the job—whether residential or commercial.